November 15 2017
Beginning of our new alterations. Side fence on Carey St removed.

Before the Demolition
Church and old Hall Nov 17

Back view of site buildings before hall demolition

Poinciana to remain!
There will still be some tree shade remaining on the new car park site.

Old Demolished Hall

Vestry under alterations
A whole new vestry will be refurnished

Where's the organ and piano?
There will be a new placment in the church of the organ and piano

Child friendly
The cry room has been removed

Former Church Offices

A work in progress...
Interior of the church - floors to be completely redone and new carpet will be laid.

The old Kindergarten building
The church and old Kindergarten becoming one building.

The Old Hall
The last of the hall demolition - walls and roof all removed

Out with the old
Demolition rubbish from Hall and Kindy

The old Hall frame
The end of an era and a new carpark to be built in its place

A new home for these memorial windows
These windows have been relocated to the new hall and entrance to the chuch. The old frame of the Kindy being remodeled to fit the new build for the new hall.

The Carey Street view of the old exterior

The beginning of the removal of the old roof

New Hall renovations
The old Kindergarten becoming the new Hall building

Out with the old in with the New!
Removal of the old roof and progressive replacement of the new roof

Removal and Replacment of old roof

Completing the new roof
The church’s old roof removed and being replaced with new colourbond

New roof completed on the entry
This ramp to be removed and replaced on the adjoining side of entry steps

Commencement of the new Hall roofing
Replaced old roof and extension for the new hall to match the length of the church is beginning to take shape

Back view of work site
Old hall completely demolished to make way for the new parking area

Work site in December 2017
Work site showing ground work completed of removal of old Hall

Excavation commencement for ground works
Works for water and sewerage pipe changes to allow the new floor to be laid for Hall

Ground works continuing
Leveling the ground having removed the old Hall foundations

Back view of site in December 2017
Ground leveled where previous hall stood

New floor lfoundation layout for building
Foundations for the extensions to cater for new Hall

New underground works
GC Council required changes to the original underground pipe work

New building to have airconditioning
The two renovated buildings will be air conditioned for the seasons

Vestry
Vestry stripped ready for remodeling

Church interior
Photo taken from Vestry door looking to entrance of the church after removing the organ floor.

Feb 2018 Back view of work site
Frame for the Hall changes progressing

Ground works Dec 2017
Many vehicles make light work!

New outside walls going up
New extension on Hall - outside walls being erected

Roof trusses for Hall
New extension roof trusses placed ready for erecting

Hall Ducting in place
Trusses up and ducting ready for interior walls to be built

Frame work
Wiring in the frame ready for new ceiling and walls

Vestry Ceiling
Ceiling frame ready for walls and ceiling to be installed in the vestry

Hall Interior
Interior frame for walls for reception and kitchen being installed

Replacement of stained glass windows
Stained glass windows from church wall beside the old Kindy - now a joined wall. Replaced at entry - beautiful addition. Removal of old ramp.

New entry and reception area work site
The new reception windows and entry to the Hall. Notice the replaced stained glass windows from the church in the new Pastor’s office wall.

Stained Glass window replacement from Church
Stained Glass window from right wall of church - (now the interior ablution rooms wall) - replaced over centre back eaves of Hall entry

Rear Site view - March 2018
Roof all completed and new wall insulated ready for cladding

Rear doors to Hall installed March 2018

Hall interior walls
Kitchen walls completed waiting for cabinetry and interior ceiling in the process of being installed. Floor to be leveled ready for vinyl installation

Interior of the Hall site work
Interior work on the new Hall. Walls up and ready for ceiling completion - Looking from front offices to back of Hall

New ceiling in church
Ready for new ceiling installation in the church where required due to joining of the buildings and removal of the cry room

New look beginning for the Renovations
Rendering of the church walls - covering the old brick work. - Starting to take shape!

Starting to look like new!
New roof - cladding painted and exterior rendering started - showing a new facade view of the Church

New roof cross - Take I
This cross was installed on the roof to replace the old broken cross that sat on the old roof for many years. However it has to be replaced also as it was not built to our specifications. Watch this space for the replacement!

Up Up and away
Unfortunately this cross has to be reinstalled for our correct specifications.

Site area for the new ramp for new door - entry to Church
Despite the rain…. work continues on the rendering and foundation for entry to new doorway underway

Side of hall looking down towards the proposed new carpark area.
Side view of the new Hall taking shape with rendering of the exterior walls

Cross - Take 1 # 3
The new replacement cross will still be positioned in this site on the roof

Hall Ceiling
Almost complete

New ramp church entry
Footings and frame work for new ramp to the new door entry to the church. Front entry door to the Hall at the reception area showing as well.

Vestry walls & ceiling
Completed waiting for cupboards and sink installation

Repositioned stained windows
New entry……..These now face Carey street where the old ramp entry doors were located ….now closed and this solid wall has replaced it.

Advancing ramp entry
Ramp proceeding according to plans

Back of the Hall and Church May 2018
Back ramp cemented and parking area still being prepared

New leadlight window installed in the vestry
Newly donated Lead-light window installed.

Church renovation update May 2018
Entry ramp ready for cement pour on May 3rd.


The Church inside walls being given a facelift

Church Lights
New church lighting installed - now for the floors

New Memorial window
The first of two new leadlight windows in the vestry

Church Interior April 2018
Interior painting almost completed

Exterior of the Hall
Exterior wall of the new hall looking back from Queen St corner

Front Hall entrance
Prep work for the church ramp and front entrance to the Hall

Church Interior
The hall floor ready for sanding and polishing

Foot paths completed

New Hall kitchen
Kitchen benches installed

New Car park walkway kerbing

29th September 2015 notice
Close to removing this sign from our church entry doors

Car park prepartion